Dam construction and subsequent reservoir inundation may affect sensitive plants and wildlife, thus requiring rigorous environmental permitting. Even with permits in hand, routine surveys may result in the unexpected discovery of sensitive species during project implementation. For dam construction projects, delays or work stoppages to allow for agency consultation and issuance of amended permits are problematic and potentially expensive. The San Vicente Dam Raise (SVDR) Project entails construction activity with habitat impacts. Initial surveys indicated three federally listed endangered species were present. A Biological Opinion for these species was issued as part of the Endangered Species Act Section 7 consultation between the U.S. Fish & Wildlife Service (USFWS) and the U.S. Army Corps of Engineers (Corps). However, during preconstruction surveys, a species not addressed with the permits, the federally listed endangered Quino Checkerspot Butterfly (Euphydryas editha quino) was unexpectedly observed on site. To avoid delays and address the species, the Water Authority and its consultant (Dudek) requested informal consultation with the agencies. Biologists were mobilized and Dudek used a USFWS model to estimate “occupied Quino Checkerspot Butterfly habitat”. The Water Authority team worked quickly and cooperatively with the agencies to conduct a site visit, prepare graphics, provide the model results, and prepare documents for use in permit amendments. Based on this information, impacts were calculated, mitigation was negotiated, and the amended Corps Section 404 permit and Biological Opinion were issued. The formal consultation process was completed in less than three weeks and resulted in no change in the project schedule.
机译:大坝施工和随后的水库淹没可能影响敏感的植物和野生动物,从而需要严格的环境允许。即使在手中允许,常规调查可能导致项目实施期间意外发现敏感物种。对于大坝建设项目,延迟或工作停放允许机构咨询和发布修改许可证是有问题的并且可能昂贵的。 San Vicente Dam Red(SVDR)项目需要栖息地影响的建筑活动。初始调查表明存在三种联邦上市濒危物种。作为濒危物种法案第7条的一部分发出了这些物种的生物意见第7节美国鱼类和野生动物服务(USFWS)与美国军队(军团)之间的磋商。然而,在预设调查期间,在现场出乎意料地观察到未授权的物种,未经许可,联邦上市濒危Quino Checkerspot蝴蝶(Euphydryas Editha Quino)。为避免延误和解决物种,水务局及其顾问(Dudek)要求与各机构进行非正式磋商。生物学家被动员,Dudek使用了USFWS模型来估计“被占用的Quino Checkerspot蝴蝶栖息地”。水机构团队与机构进行迅速且合作,进行网站访问,准备图形,提供模型结果,并准备在许可证修正案中使用的文件。根据这些信息,计算影响,谈判减缓,并发出了修订的欧洲核武器第404条允许和生物意见。正式咨询流程在不到三周内完成,并导致项目时间表没有变化。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号