In the South of Sichuan province a 240 MW Yeleh hydroelectric plant was constructed by Sichuan Nanya River Basin Hydraulic Power Development Company Limited, a stateowned enterprise, and China Gezhou Ba Water & Power Group Company Limited. This project sets out to develop the mountain cascade of the Nanya River, a tributary of the Dadu River, provide superior electricity and adjust flood peak & frequency. The specialist contractor Foundation Engineering Company of China Water Resource and Hydropower (FEC) was awarded the contract for foundation treatment at the right bank, which included the construction of a 75m deep concrete Cut-Off Wall (COW) inside a 6.0m x 6.5m tunnel. The requirement for 19,317m~2 COW to be constructed in permeable and very dense gravel/cobble formations and a demanding project program led FEC to adopt Bauer Low Headroom Cutter CBC25/MBC30 in conjunction with Overlap Cutter Joint (OCJ).
机译:在四川省南部建立了240兆瓦的大力水电站,由四川南亚河流域液压动力开发有限公司,国务院企业,中国林州坝水能集团有限公司。该项目旨在开发南亚河山级山,这是一条大陆河的支流,提供卓越的电力和调整洪峰和频率。中国水资源和水电(FEC)的专家承包商基金会工程公司被授予右岸基础处理合同,其中包括在6.0mx 6.5米的隧道内建造75米深的混凝土切割墙(牛) 。 19,317M〜2母牛的要求以渗透性和非常致密的砾石/鹅卵石结构和苛刻的项目程序LED FEC与重叠切割接头(OCJ)一起采用Bauer低净值刀CBC25 / MBC30。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号