SAVING INSTITUTIONAL MEMORY AND THE EXTRAORIDNARY COST EFFECTIVENESS OF PROJECT DATABASES

机译:节省机构记忆和项目数据库的非凡成本效益

获取原文

摘要

There is a well known adage to the effect that “those who ignore the lessons of history are condemned to repeat the same mistakes.” This is particularly apt in the current period of dam and levee rehabilitation. In theory, for every project completed during at least the last 50 years, there should be a full “as-built” package of information available for review: such dossiers are extremely important sources of information when planning and undertaking subsequent repairs and modifications. And yet, it is the author’s experience that the expectation does not always - or even often - meet the reality. The completeness of project reporting has often been curtailed by the transfer of key personnel to the “next” project while, in other cases, the package itself - or major portions of it, such as progress photographs, or the original specifications - cannot be located. Such reports also leave the institutional memory banks when personnel retire, and/or their former offices or storerooms are “cleaned out” soon thereafter. The information contained in contemporary “lessons learned” reports will usually provide clear indications of the cause of the problems which may subsequently develop. Such reports can highlight, with the benefit of hindsight, geological features improperly treated, design assumptions no longer consistent with current practice, and defects made in construction. When these reports are complete and available, their information will allow contemporary engineers to justify not having to spend large sums of money on field research, or having to devote countless hours to “alternatives analysis.” They can therefore be extremely cost effective. There are two ways in which this historical value can be mined: by industry-wide reviews of specific technology applications, and through project-specific studies of historical records. In recent years the author has compiled two comprehensive databases relating to North American dam rehabilitation - one dealing with prestressed rock anchors, the other dealing with seepage cut-offs. The manner of their funding, execution and contents are summarized in this paper. The paper also illustrates how careful appraisal of such reports has proved invaluable in helping to understand current phenomena and in, therefore, optimizing design time and effort.
机译:有一种众所周知的谚语,即“忽视历史课程的人被谴责重复同样的错误”的效果。“这在当前的水坝和堤坝康复时特别恰当。从理论上讲,对于至少在过去的50年内完成的每个项目,应该有一个完整的“竣工”提供的信息,可供审查:在规划和进行后续维修和修改时,这些档案是极其重要的信息来源。然而,作者的经验是期望并不总是 - 甚至经常 - 达到现实。项目报告的完整性往往被关键人员转移到“下一个”项目,而在其他情况下,包装本身或其主要部分,例如进度照片或原始规格 - 不能定位。此类报告还将人员退休,和/或其前办事处或储藏室“清理出来”时留下机构记忆库。当代“经验教训”报告中所载的信息通常会提供可能随后发展的问题原因的明确迹象。此类报告可以突出,随着后视的好处,地质特征不当,设计假设不再与当前的实践一致,以及建设中的缺陷。当这些报告完整且可用时,他们的信息将允许当代工程师致力于在现场研究中花费大笔资金,或者必须将数小时数量赋予“替代分析”。因此,它们可以非常有效。有两种方式可以开采这种历史价值:通过对特定技术应用的行业频繁审查,并通过历史记录的项目特定研究。近年来,提交人编制了与北美大坝康复有关的两个综合数据库 - 一个与预应力岩石锚定,另一个与渗流截止交易。本文总结了他们的资金,执行和内容的方式。本文还说明了这些报告的仔细评估在帮助理解目前的现象以及因此优化设计时间和努力方面,这些报告的仔细评估已经证明是非常宝贵的。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号