首页> 外文会议>2011 Second International Conference on Mechanic Automation and Control Engineering >Detection, appraisement and strengthening of a plant building after fire
【24h】

Detection, appraisement and strengthening of a plant building after fire

机译:火灾后植物厂房的检测,评估和加固

获取原文

摘要

A plant building with storage of flammable materials was partly RC frame, and partly steel frame. After fire, most part of the steel frame collapsed, and the RC frame was badly damaged. Firstly, the depths of carbonation of concrete and concrete strength were detected, and then fire safety status of the plant structure was appraised. Finally, based on appraisement results, the plant structure was strengthened.
机译:储存易燃材料的工厂建筑物部分为RC框架,部分为钢框架。火灾后,大部分钢框架坍塌,钢筋混凝土框架严重受损。首先,检测混凝土的碳化深度和混凝土强度,然后评估厂房结构的消防安全状况。最后,根据评估结果,加强了工厂结构。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号