首页> 外文会议>ICONE18;International conference on nuclear engineering >ADVANCED CONSTRUCTION TECHNOLOGIES FOR THE OHMA NUCLEAR POWER PLANT REACTOR BUILDING OF ELECTRIC POWER DEVELOPMENT CO., LTD
【24h】

ADVANCED CONSTRUCTION TECHNOLOGIES FOR THE OHMA NUCLEAR POWER PLANT REACTOR BUILDING OF ELECTRIC POWER DEVELOPMENT CO., LTD

机译:电力开发有限公司OHMA核电站反应堆建筑的先进施工技术

获取原文

摘要

Electric Power Development Co., Ltd has been constructing Ohma Nuclear Power Plant aiming to start commercial operation in Nov. 2014. Ohma Nuclear Power Plant is located in Ohma-town, Aomori Prefecture and is a landmark power plant in which Mixed Oxide fuels can be loaded in the full core of the reactor. Hitachi-GE Nuclear Energy Ltd. and Kajima JV, both have extensive experience of nuclear power plant construction, are the main contractors of this project and supply the entire engineering, manufacturing of all major components, and execute the construction and commissioning for the reactor building. Ohma-town is located at the northernmost part of Aomori Prefecture bordering Tsugaru strait, where is exposed to severe cold and constant strong wind in winter. Such severe weather conditions make the construction very hard, however, Hitachi and KAJIMA tries to complete the project on schedule and on budget applying highly reliable advanced construction technologies, such as open-top and parallel construction method, all whether construction method, and large scale modularization technology.The groundbreaking (acquisition of the first construction permission) was already completed in May 2008. Its civil work steadily progressed, and the rock inspection was completed in Oct. 2009. Base mat will be completed in July 2010, and both building work and mechanical work go into full swing after installation of RCCV lower liner module.
机译:电力开发有限公司正在建设中的Ohma核电站,旨在于2014年11月开始商业运营。Ohma核电站位于青森县Ohma镇,是具有里程碑意义的发电厂,可以在其中使用混合氧化物燃料装在反应堆的整个堆芯中日立GE核能有限公司和鹿岛合资公司均具有核电站建设的丰富经验,是该项目的主要承包商,并提供整个工程,所有主要部件的制造以及执行反应堆建筑的建设和调试。 Ohma-town位于青森县最北部,与Tsugaru海峡接壤,冬季时受到严寒和持续强风的影响。如此恶劣的天气条件使施工变得非常困难,但是,日立和KAJIMA试图使用高度可靠的先进施工技术(如开顶和平行施工方法,无论是施工方法还是大规模施工),按计划并按预算完成项目。模块化技术。 破土动工(获得第一份施工许可)已于2008年5月完成。土建工作稳步进行,岩石检查工作于2009年10月完成。基垫将于2010年7月完成,建筑工程和机械工程安装RCCV下衬板模块后全面展开。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号