Vibration Testing and Analysis of Tunnel Foundation Pit Enclosing Pile due toMoving Bullet Train

机译:隧道基坑围护桩振动引起的振动测试与分析移动子弹头列车

获取原文

摘要

The Shijiazhuang six-line tunnel of the Beijing-Shijiazhuang passenger special line is adjacent to a busy and important railway, the Beijing-Guangzhou railway line. Reinforced concrete enclosing piles are adopted during the tunnel excavation cut, and two structures of anchor, reinforced concrete stays and anchor lateral support system are also used. In order to ensure construction and construction process safety, the vibration of the foundation pit piles immediately adjacent to the Beijing-Guangzhou line is tested. In this paper, the time-history curve and spectral curve of the pile is given due to a moving bullet train (Lei, 2003). Analysis of test data provides a useful experience and reference for similar projects in the future.
机译:京石客运专线的石家庄六线隧道毗邻繁忙的重要铁路京广铁路线。隧道开挖时采用钢筋混凝土围护桩,还采用了锚固结构,钢筋混凝土撑杆和锚固侧向支护两种结构。为了确保施工和施工过程的安全,对紧邻京广线的基坑桩的振动进行了测试。在本文中,由于移动的子弹头列车,给出了桩的时程曲线和频谱曲线(Lei,2003)。测试数据的分析为将来的类似项目提供了有用的经验和参考。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号