首页> 外文会议>World Dredging Congress >THE TREATMENT SCHEME OF REMAINED WATER AND ANALYSIS OF MONITORING RESULTS FOR ENVIRONMENTAL DREDGING PROJECT: TAKING ENVIRONMENTAL DREDGING PROJECT ON ZHUSHAN AREA OF TAIHU LAKE AS AN EXAMPLE
【24h】

THE TREATMENT SCHEME OF REMAINED WATER AND ANALYSIS OF MONITORING RESULTS FOR ENVIRONMENTAL DREDGING PROJECT: TAKING ENVIRONMENTAL DREDGING PROJECT ON ZHUSHAN AREA OF TAIHU LAKE AS AN EXAMPLE

机译:剩余水的治理方案及环境治理工程的监测结果分析-以太湖竹山地区环境治理工程为例

获取原文

摘要

In the ecological desilting project in Zhushanhu of Taihu Lake, according to the situation, adding flocculant is the method adopted to treat the remained water around the discharge area for the first time, which is a method that aims to effectively control the water quality. In the experimental production, it is proved to be effective and worth promotion after improvem6ent. This paper gives an analysis on the overall improvement effect of the fiocculant and water quality according to the design of the remained water treatment equipment adopted in the project and the on-operation approach of the remained water treatment. The conclusion is made from three aspects:the relationship between density of fiocculant and the production quantity of flocculent precipitate or flocculating timethe relation between the quantity of fiocculant and the value of suspended matters in the remained water as well as the water quality indexthe direct relation between the final quantity of the fiocculant and the project quantity of the desilting work.
机译:在太湖竹山湖生态清淤工程中,根据情况,首次采用絮凝剂处理流域周围剩余水的方法,是有效控制水质的一种方法。在实验生产中,经证明是有效的,改进后值得推广。根据项目采用的余水处理设备的设计和余水处理的运行方式,对絮凝剂和水质的整体改善效果进行了分析。从三个方面得出结论:絮凝剂的密度与絮凝沉淀物的产生量或絮凝时间之间的关系,絮凝剂的量与残留水中悬浮物的价值之间的关系以及水质指标之间的直接关系。絮凝剂的最终数量和清淤工作的项目数量。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号