首页> 外文会议>IEEE 17th International Industrial Engineering and Engineering Management >A new cell formation problem with the consideration of multifunctional machines and in-route machines dissimilarity - A two phase solution approach
【24h】

A new cell formation problem with the consideration of multifunctional machines and in-route machines dissimilarity - A two phase solution approach

机译:考虑到多功能机器和在途机器之间的差异性的新的细胞形成问题-两阶段解决方案

获取原文

摘要

The purpose of this paper is to develop a variety of cell formation problem (CFP) that considers new concepts. Due to utilizing the machine flexibility causing system flexibility, multifunctional machines are used in the CFP. Machine-operation and part-operation are defined to introduce machine capabilities and part requirements, respectively. A novel solution approach with two phases is presented to solve the considered problem. First phase is a mathematical model proposed to define machines grouping. This model is seeking to minimize in-route machines dissimilarity. Second phase allocated to a heuristic method which assigns parts to corresponding cells. For validation the presented solution approach some test instances are solved: Two critical examples of CFP in [5], and a new one that design to illustrate the complete characteristics of the considered problem. Results show the capability of proposed approach in comparison with other methods to solve the variety of cell formation problems.
机译:本文的目的是开发各种考虑新概念的细胞形成问题(CFP)。由于利用了机器灵活性,从而导致了系统灵活性,因此在CFP中使用了多功能机器。定义机器操作和零件操作分别介绍机器功能和零件要求。提出了一种具有两个阶段的新颖解决方案来解决所考虑的问题。第一阶段是提出的定义机器分组的数学模型。该模型正在寻求最大程度地减少路线中的机器差异。第二阶段分配给启发式方法,该方法将部分分配给相应的单元格。为了验证所提出的解决方案方法,解决了一些测试实例:[5]中的两个CFP关键示例,以及一个旨在说明所考虑问题的完整特征的新示例。结果表明,与其他方法相比,该方法具有解决各种细胞形成问题的能力。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号