首页> 外文会议>Proceedings of the 6th Advanced Forum on Transportation of China >Effect analysis on railway productivity distribution adjustment to freight forwarding time
【24h】

Effect analysis on railway productivity distribution adjustment to freight forwarding time

机译:铁路生产力分配调整对货代时间的影响分析

获取原文

摘要

In order to analyze the effects of railway productivity distribution adjustment on the timeliness of freight forwarding, on the basis of investigation and present achievement, the railway freight forwarding process and the change of each factor which affects freight forwarding time under the condition of railway productivity distribution adjustment are analyzed. The average speed of each kind of freight train including non-through train, ordinary through train and fast freight train, as well as daily average running time of heavy train is analyzed, and the statistical results are examined by adopting χ2 testing method, from which daily average running tariff kilometre is obtained. Finally, daily average running tariff kilometre before and after railway productivity distribution adjustment is compared. The analytical results show that through the adjustment of railway productivity distribution, the operating taches of railway freight forwarding gradually reduce, and the primary parameters influencing θ all have changes to different degree, and the timeliness of railway freight forwarding improves constantly.
机译:为了分析铁路生产力分配调整对货运及时性的影响,在调查和现有成果的基础上,研究了铁路生产力分配条件下铁路货运过程以及影响货运时间的各个因素的变化。调整进行了分析。分析了包括直通车,普通直通车和快速货运列车在内的每种货运列车的平均速度,以及重型列车的每日平均运行时间,并采用χ 2 < / sup>测试方法,从中可以获得每日平均运行费公里。最后,比较了铁路生产力分配调整前后的日均运行电价公里。分析结果表明,通过铁路生产力分布的调整,铁路货运代理的运行速度逐渐减小,影响θ的主要参数都有不同程度的变化,铁路货运的及时性不断提高。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号