The control model of engineering cost in construction phase of high-speed railway

机译:高速铁路建设阶段工程造价控制模型

获取原文

摘要

To improve the efficiency of cost control in the high speed railway construction phase, we set up the model of earned value and install FBCWS index, through the contrast between FBCWS index and ACWP' index, we improve the efficiency of cost control in construction stage, so that we can do the better in the direction and control before costs incurred and make the construction cost control management more scientifically and effectively in the construction phase of high-speed rail project.
机译:为了提高高速铁路建设阶段的成本控制效率,我们建立了盈余模型,并建立了FBCWS指标,通过FBCWS指标与ACWP'指标的对比,提高了施工阶段的成本控制效率,这样,在高铁工程建设阶段,就可以更好地做到在费用发生前的指导和控制,使施工成本控制管理更加科学,有效。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号