首页> 外文会议>INMM annual meeting >Implementation of an Expanded Material Control and Accounting Program (MPCA) throughPerformance of a Gap Analysis and an Expanded MPCA Plan at the Mining and Chemical Combine
【24h】

Implementation of an Expanded Material Control and Accounting Program (MPCA) throughPerformance of a Gap Analysis and an Expanded MPCA Plan at the Mining and Chemical Combine

机译:通过以下方式实施扩展的物料控制和会计程序(MPC&A)采矿和化工联合企业的差距分析和扩大的MPC&A计划的执行

获取原文

摘要

Since 1996, the Mining and Chemical Combine (MCC- formerly known as K-26), and the United StatesDepartment of Energy (DOE) have been cooperating under the cooperative Nuclear Material Protection,Control and Accounting (MPC&A) Program between the Russian Federation and the U.S. Governments.Since MCC continues to operate a reactor for steam and electricity production for the site and city ofZheleznogorsk which results in production of the weapons grade plutonium, one of the goals of theMPC&A program is to support implementation of an expanded comprehensive nuclear material controland accounting (MC&A) program. To date MCC has completed upgrades identified in the initial gapanalysis and documented in the site MC&A Plan and is implementing additional upgrades identifiedduring an update to the gap analysis. . The scope of these upgrades includes implementation of MCCorganization structure relating to MC&A, establishing material balance area structure for special nuclearmaterials (SNM) storage and bulk processing areas, and material control functions including SNM portalmonitors at target locations. Material accounting function upgrades include enhancements in theconduct of physical inventories, limit of error inventory difference procedure enhancements,implementation of basic computerized accounting system for four SNM storage areas, implementationof measurement equipment for improved accountability reporting, and both new and revised site-levelMC&A procedures. This paper will discuss the implementation of MC&A upgrades at MCC based onthe requirements established in the comprehensive MC&A plan developed by the Mining and ChemicalCombine as part of the MPC&A Program.
机译:自1996年以来,美国采矿与化学联合公司(MCC-以前称为K-26) 能源部(DOE)一直在“核材料保护”合作之下进行合作, 俄罗斯联邦和美国政府之间的控制和会计(MPC&A)计划。 由于MCC继续为该州和该市运营蒸汽和电力生产反应堆 兹列兹诺戈尔斯克(Zheleznogorsk)生产武器级p,这是该国的目标之一。 MPC&A计划将支持实施扩展的全面核材料控制 和会计(MC&A)计划。迄今为止,MCC已完成了最初差距中确定的升级 分析并记录在现场MC&A计划中,并正在实施确定的其他升级 在更新差距分析过程中。 。这些升级的范围包括实施MCC 与MC&A有关的组织结构,建立特殊核材料的物料平衡区结构 物料(SNM)的存储和批量处理区域,以及物料控制功能(包括SNM门户) 监视目标位置。重大会计功能升级包括以下方面的增强功能: 实物盘存的行为,错误盘存差额程序改进的限制, 实施四个SNM存储区域的基本计算机会计系统,实施 用于改进问责制报告的测量设备,以及新的和修订的站点级别 MC&A程序。本文将讨论基于以下内容的“我的客户中心” MC&A升级的实施情况 采矿和化工制定的全面MC&A计划中确定的要求 合并为MPC&A计划的一部分。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号