Automated Front-End Planning for Cost and Schedule: Variables for Theory and Implementation

机译:成本和进度的自动化前端计划:理论和实施变量

获取原文

摘要

The reliability and accuracy of 'preliminary estimate' and 'preliminaryschedule' as part of front-end planning is mainly affected by the 'specificcharacteristics of a construction project', 'project details determined at the time ofplanning', 'experience of the planners', and 'historical database of similar projects'.The purpose of this paper is to evaluate the variables that critically influence theviability of automated front-end planning tools. A framework of variables is firstproposed in order to evaluate the comprehensiveness of the system objectives.Because there have not been many efforts to develop this type of tools, this studyintroduces recent real-world cases of the automated front-end planning system.Finally, findings from the entire research process are briefly summarized, andimplications and lessons learned for further development are outlined as well.
机译:“初步估计”和“初步估计”的可靠性和准确性 进度计划”作为前端计划的一部分,主要受“具体计划”的影响 建设项目的特征”,“在 规划”,“规划者的经验”和“类似项目的历史数据库”。 本文的目的是评估严重影响产品质量的变量。 自动化前端计划工具的可行性。首先是变量框架 为了评估系统目标的全面性而提出。 由于没有太多努力来开发此类工具,因此本研究 介绍了自动化前端计划系统的最新实际案例。 最后,简要总结了整个研究过程中的发现,并 还概述了进一步发展的意义和经验教训。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号