Agent Risk and Its Prevention Measures in Agent Construction System

机译:代建制中的代理风险及其防范措施

获取原文

摘要

As one of the significant methods in management of government investment projects, agent construction system has recently achieved rapid progress in practice and in theoretical research . Risk problems are one of the bottleneck problems in the development of agent construction system. Risk problems have important effect on the development of agent-company and the formation of fair agent construction market. This paper analyzed the respective risks of investor, user and agent in agent construction system. According to the risks comparison, the agent undertook main risks of project management. Based on the risks analysis, the agent's main risks in public investment projects were identified, which were technology risks, management risks and other risks. The influence factors of three main risks were also distinguished. In the practice of agent construction system, risk management of agent was a weakness in project management. In term of current administrative system and regulations, the possible risk prevention measures for agent were studied. The preferable risk prevention measures were listed as improving the quality of staff, perfecting contract management, transferring the risk through engineering insurance, and adopting feasible risk response strategies.
机译:代建制是政府投资项目管理的重要手段之一,近年来在实践和理论研究上取得了长足的进步。风险问题是代理构建系统开发中的瓶颈问题之一。风险问题对代理商公司的发展和公平的代理商建设市场的形成具有重要影响。本文分析了代理商建设系统中投资者,用户和代理商的各自风险。根据风险比较,代理商承担了项目管理的主要风险。根据风险分析,确定了代理人在公共投资项目中的主要风险,即技术风险,管理风险和其他风险。还对三个主要风险的影响因素进行了区分。在代建制的实践中,代建制的风险管理是项目管理中的一个弱点。根据现行的管理制度和法规,研究了代理商可能采取的风险防范措施。较好的风险防范措施包括提高员工素质,完善合同管理,通过工程保险转移风险,采取可行的风险应对策略。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号