首页> 外文会议>International Conference on Industrial Engineering and Engineering Management;IEEM'2008 >Evolution of the Dispute-Resolution Mechanism of FIDIC Contract
【24h】

Evolution of the Dispute-Resolution Mechanism of FIDIC Contract

机译:FIDIC合同争议解决机制的演变

获取原文

摘要

FIDIC contract is praised as the "Bible" of civil engineering. It serves as the international practice and general standard for civil engineering projects. The dispute-resolution mechanism of FIDIC contract has experienced a development process from engineer deciding to DAB adjudicating. This paper, after analyzing the dispute-resolution mechanism of FIDIC contract, reveals the deficiencies of engineer deciding and DAB adjudicating. Furthermore, on the basis of a comparison between DAB and DRB dispute resolution mechanisms, it points out the development trend of the dispute-resolution mechanism of FIDIC contract.
机译:FIDIC合同被誉为土木工程的“圣经”。它是土木工程项目的国际惯例和通用标准。 FIDIC合同的争议解决机制经历了从工程师决定到DAB裁决的发展过程。在分析了FIDIC合同的争议解决机制之后,揭示了工程师决定和DAB裁决的不足。此外,在对民建联和民防争议解决机制进行比较的基础上,指出了FIDIC合同争议解决机制的发展趋势。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号