Issues Involving the Development and Implementation of Operation and Maintenance Plans and Startup, Shutdown, and Malfunction Plans to Comply with the Integrated Iron and Steel MACT Rule

机译:制定和实施运营与维护计划以及启动,关闭和故障计划以符合钢铁MACT综合规则的问题

获取原文

摘要

Operation and Maintenance (O & M) Plans and Startup, Shutdown, and Malfunction(SSM) Plans must be prepared and implemented for affected sources under the IntegratedIron & Steel (II&S) Maximum Achievable Control Technology (MACT) rule ("therule"). For most applicable facilities, these requirements became effective on May 22,2006.The requirements for O & M Plans include monthly inspections of equipment importantto the performance of the capture system; specific baghouse inspections under varyingfrequencies; preventative maintenance requirements for venturi scrubbers andelectrostatic precipitators (ESP's); selection and justification of operating limits forcertain capture systems; corrective action procedures for baghouses equipped with bagleak detection systems or continuous opacity monitors (COMS); corrective actionprocedures for venturi scrubbers equipped with continuous parameter monitoring systems(CPMS); and corrective action procedures for ESP's equipped with COMS.SSM Plans must be prepared in accordance with the provisions in §63.6(e)(3). Theseplans must address a program of corrective action for malfunctioning process and airpollution control and monitoring equipment used to comply with the relevant standard.The paper addresses several issues involved in the development and implementation of O& M Plans and SSM Plans for several iron and steel industrial clients. For example,some rulemaking language is not amendable to how certain iron and steelmakingprocesses actually operate, and decisions must then be made to how best address theseissues. Recommendations are provided to how best address these issues from either aregulatory basis or engineering solution approach.
机译:操作和维护(O&M)计划以及启动,关闭和故障 (SSM)必须为综合计划下的受影响源准备和实施计划 钢铁(II&S)最大可实现控制技术(MACT)规则(“ 规则”)。对于大多数适用的设施,这些要求已于5月22日生效, 2006年。 运维计划的要求包括每月对重要设备进行检查 捕获系统的性能;具体的布袋除尘器检查根据不同 频率;文丘里洗涤器和 静电除尘器(ESP);选择和证明操作极限 某些捕获系统;装有袋子的集尘室的纠正措施程序 泄漏检测系统或连续不透明监测仪(COMS);纠正措施 配有连续参数监控系统的文丘里洗涤器的操作步骤 (CPMS);以及配备COMS的ESP的纠正措施程序。 SSM计划必须按照§63.6(e)(3)中的规定进行准备。这些 计划必须针对程序和空气故障提出纠正措施计划 所使用的污染控制和监测设备要符合有关标准。 本文讨论了O的开发和实施中涉及的几个问题 &M计划和SSM计划,适用于多个钢铁工业客户。例如, 某些规则制定语言对某些钢铁制造商不适用 流程实际运行,然后必须做出决策以最佳方式解决这些问题 问题。从以下两个方面提供了有关如何最好地解决这些问题的建议 法规依据或工程解决方案方法。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号