首页> 外文会议>Congreso y Exposición Internacional del Petróleo en México (Memorias Técnicas 2006) >Integrated Project Management in South Mexico and Well Construction Optimization on Deep and Depleted Carbonates
【24h】

Integrated Project Management in South Mexico and Well Construction Optimization on Deep and Depleted Carbonates

机译:南墨西哥的综合项目管理和深层和贫层碳酸盐的油井建设优化

获取原文

摘要

The Bermudez Complex is located in South Mexico; it constitutes of three main fields: Iride, Samaria and Cunduacan and was discovered in 1972. In terms of oil production it is the most important field in the southern region and is one of the principle blocks in the country. Production exceeded half a million of barrels per day in the past; however since then it has experienced a drastic formation pressure reduction. Well construction in the area has been characterized by the difficulties experienced in effectively isolating the high pressure zones located just above the carbonates in the reservoir, and by the need to drill the pay zone with hydrostatic equivalents much lower than the ones generated by conventional liquid fluids. The depth of the wells, the structure tectonically disturbed by fractured and faulted blocks, the high temperature and the need for directional drilling control, are variables that challenge the design and drilling of these wells. Recently, a typical integrated drilling and completion commercial scheme has been implemented in the complex using five large drilling rigs operating simultaneously and managed by an integrated Project Management team allowing flexibility in applying new technologies along with standard products and services. In spite of the unfavorable and extremely low reservoir pressures, the drilling and completion times have been considerably optimized through the application of several techniques and processes that when properly applied and coordinated allowed the project to reach aggressive goals. The main practices and technologies applied are as follows: drilling with foam densities as low as 2.9 ppg, isolation of different productive zones under hostile environments, use of the latest generation of drilling bits, a process for defining the technical limits and the capturing of best practices/lessons learned, and finally a multidisciplinary task team working closely with geosciences support enabling optimal casing seat on a highly complex geological environment.
机译:伯穆德兹综合大楼位于南墨西哥。它由三个主要油田组成:伊里德(Iride),撒马里亚(Samaria)和坎杜卡坎(Cunduacan),于1972年被发现。就石油生产而言,它是南部地区最重要的油田,并且是该国的主要区块之一。过去每天的产量超过五十万桶;但是从那时起,它经历了急剧的地层压力降低。该地区的油井建设具有以下特点:有效地隔离位于储层碳酸盐上方的高压区时遇到困难;需要用比静液压油当量低得多的静水当量来钻探采油区。 。井的深度,裂缝和断层块在构造上受扰动的结构,高温以及对定向钻井的需求,这些都是挑战这些井的设计和钻井的变量。最近,在综合设施中实施了一个典型的综合钻探和完井商业计划,使用了五个同时运行的大型钻机,并由一个集成的项目管理团队进行管理,从而可以灵活地将新技术与标准产品和服务一起应用。尽管不利且极低的储层压力,但通过采用多种技术和工艺已大大优化了钻井和完井时间,这些技术和工艺在适当应用和协调下可以使项目达到积极的目标。所采用的主要实践和技术如下:泡沫密度低至2.9 ppg的钻探,在不利环境下隔离不同的生产区,使用最新一代的钻头,定义技术极限和获取最佳技术的过程实践/经验教训,最后是一个与地球科学紧密合作的多学科任务小组,可在高度复杂的地质环境中实现最佳套管位置。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号