首页> 外文会议>POWER-GEN international conference >60-cycle to 50-cycle Conversion of an F-class Gas Turbine
【24h】

60-cycle to 50-cycle Conversion of an F-class Gas Turbine

机译:F级燃气轮机从60循环转换为50循环

获取原文

摘要

In this paper the potential for conversion of an F-class combustion turbine from generating 60-cycle powerto 50-cycle power will be examined. These turbines are rated for a nominal 60-cycle ISO output of175-185 MW. With the gas turbine boom of the late 1990s and the cancellation of several GT basedprojects that followed, a surplus of GTs has been created. This surplus has resulted in the review ofalternative options for installation at other plants or resale of GTs other users. One potential solution is theconversion of a GT into a 50-cycle machine for installation in other markets around the world. If this typeof conversion proves feasible, it also opens the door for the 60-cycle designed GTs to be marketed overseasto compete with original 50-cycle equipment.Three potential options for creating 50 Cycle power with a 7FA are identified:1. Operate the combustion turbine generator (CTG) at 3000 RPM to generate energy at50 Hz.2. Operate the CTG at 3600 RPM to generate energy at 60 Hz and install an invertor,external to the CTG, to convert 60 Hz potential to 50 Hz.3. Operate the turbine at 3600 RPM and the generator at 3000 RPM by installing a gearbox(speed reducer) between the turbine and the generator.The options were researched and pricing was obtained on those that were considered feasible. GE was alsocontacted to provide input and identify potential difficulties for each of the scenarios. The results for eachof the options are provided below.
机译:本文研究了产生60循环功率的F级燃气轮机的转换潜力 至50周期的功率将被检查。这些涡轮机的额定60周期ISO输出为 175-185兆瓦。随着1990年代后期的燃气轮机热潮以及一些基于GT的GT的取消 在随后的项目中,已经创建了过多的GT。盈余导致对 在其他工厂安装或向其他用户转售GT的替代选项。一种潜在的解决方案是 将GT转换为50周期的机器,以安装在世界各地的其他市场。如果是这种类型 转换的可行性证明是可行的,这也为60周期设计的GT敞开了大门,将其推向海外市场 与原始的50周期设备竞争。 确定了使用7FA创建50周期功率的三种可能的选择: 1.以3000 RPM的转速运行燃气轮发电机(CTG),以产生 50赫兹 2.以3600 RPM的转速运行CTG以产生60 Hz的能量,并安装一个逆变器, 在CTG外部,将60 Hz的电势转换为50 Hz。 3.通过安装齿轮箱,使涡轮以3600 RPM的转速运行,发电机以3000 RPM的转速运行 (减速器)在涡轮和发电机之间。 对这些选项进行了研究,并对认为可行的价格进行了定价。通用电气当时 联系以提供意见并确定每种情况下的潜在困难。每个结果 以下提供了其中的一个选项。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号