首页> 外文会议>Waste management symposium >THE U.S.DEPARTMENT OF ENERGY’S RESOLUTION STRATEGY FOR THE U.S.NUCLEAR REGULATORY COMMISSION’S KEY TECHNICAL ISSUE AGREEMENTS:AN INTEGRATED APPROACH
【24h】

THE U.S.DEPARTMENT OF ENERGY’S RESOLUTION STRATEGY FOR THE U.S.NUCLEAR REGULATORY COMMISSION’S KEY TECHNICAL ISSUE AGREEMENTS:AN INTEGRATED APPROACH

机译:U.S.ENTEPOPARTMETECOPETION U.S.NUCLEN监管委员会的重点技术问题协议:综合方法

获取原文

摘要

The Nuclear Waste Policy Act required the U.S.Nuclear Regulatory Commission(NRC)to comment on the Yucca Mountain Site Recommendation relative to the sufficiency of the Project’s information to support a potential license application.As part of the NRC’s associated review process a series of meetings held between August,2000 and September,2001,the U.S.Department of Energy(DOE)and the NRC established 293 agreements to address NRC’s questions and information needs relative to Key Technical Issues related to postclosure performance and preclosure safety and operations of a geologic repository for high-level spent fuel and nuclear waste at Yucca Mountain,Nevada.These Key Technical Issues(KTIs)are:Container Life and Source Term;Evolution of the Near Field Environment;Igneous Activity;Repository Design and Thermal Mechanical Effects;Radionuclide Transport;Structural Deformation and Seismicity;Thermal Effects on Flow;Total System Performance Assessment Integration;Unsaturated and Saturated Flow under Isothermal Conditions;and Preclosure Issues. Since the KTI agreements were established,DOE and NRC have had a series of interactions focused on resolution in order to facilitate NRC acceptance and review of DOE’s license application for construction authorization,currently scheduled in December 2004.In fact,these agreements have been an effective way to focus program resources and attention on those issues most important to licensing the geologic repository.DOE’s original approach to issue resolution involved submittal of documentation on single or small groups of related KTI agreements.However,recognizing that addressing each agreement in isolation was not as effective as a more comprehensive approach,in 2003 DOE significantly revised its issue resolution methodology by developing resolution documents that group the KTI agreements in an integrated holistic view of the repository system’s natural and engineered components.The majority~1 of the original KTI agreements will be addressed in these groups,which are:1)Climate and Infiltration;2) Unsaturated Zone Flow;3)Water Seeping into Drifts;4)Mechanical Degradation and Seismic Effects;5) In-Drift Chemical Environment;6)Waste Package and Drip Shield Corrosion;7)In-Package Environment and Waste Form Degradation and Solubility;8)Colloid Transport;9)Engineered Barrier System Transport;10)Unsaturated Zone Transport;11)Saturated Zone Flow and Transport;12) Biosphere Transport;13)Volcanic Events;and,14)Low-Probability Seismic Events.This revised approach is consistent with the U.S.Nuclear Regulatory Commission’s Yucca Mountain Review Plan[1] and the regulatory requirements at 10 CFR Part 63[2].Documentation addressing the remaining KTI agreements is scheduled to be submitted to the NRC by August 2004.
机译:核废料政策法案所需的USNuclear监督管理委员会(NRC)相对于该项目的信息是否充分尤卡山网站上的建议意见,支持NRC的相关审查程序的潜在许可证application.As部分举行了一系列会议, 2000年8月和2001年9月间,美国能源部(DOE)和NRC建立293个协议地址NRC的问题和信息需求相对于涉及高地质处置库postclosure性能和preclosure安全与运营关键技术问题-Level尤卡山,Nevada.These关键技术问题(KTIs)乏燃料和核废料是:集装箱生命和源项;近场环境演化;火山活动;库设计和热机械效应;放射性核素运输;结构变形和地震;上流动的热效应;总体系统性能评估一体化;不饱和和饱和弗洛W¯¯下等温条件和Preclosure问题。由于KTI协议建立,能源部和核管理委员会已经进行了一系列的互动集中在分辨率,以便于施工许可,目前预定在十二月2004.In其实DOE证申请的受理NRC和审查,这些协议都得到了有效办法焦点节目资源和注意力上牌地质repository.DOE的原始的方法解决问题的相关KTI agreements.However的单件或小团体的文档提交参与,认识到解决隔离每个协议是不是最重要的那些问题有效的更全面的方法,在2003年美国能源部显著通过发展解决文档组在原KTI协议的仓库系统的自然和工程components.The多数〜1的综合全面的观点的KTI协议进行修订,其问题的解决方法解决这些基团,它们是:1)气候和Infil登记领; 2)非饱和带流量; 3)水渗入漂移; 4)机械降解和地震效应; 5)在漂移化学环境; 6)废物包和滴水罩腐蚀; 7)在-软件包环境和废物体降解和溶解度; 8)胶体运输; 9)工程屏障系统传输; 10)不饱和区运输; 11)饱和区流量和传送带; 12)生物圈运输; 13)火山活动;以及,14)低概率地震Events.This修订后的办法是与USNuclear监督管理委员会的尤卡山复习计划[1],并在监管要求一致的10 CFR第63 [2] .Documentation解决剩余KTI协议,定于2004年8月提交给NRC。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号