首页> 外文会议>SPE annual technical conference and exhibition >Comparison of Two Low-Permeability Horizontal Devonian Projects in the Permian Basin with Competing Completion Techniques
【24h】

Comparison of Two Low-Permeability Horizontal Devonian Projects in the Permian Basin with Competing Completion Techniques

机译:二叠纪盆地低渗透水平泥盆纪项目的竞争完井技术比较

获取原文

摘要

Detailed production data from 32 horizontal Devonian wells inthe Permian Basin was studied to determine if the impact ofvarious completion methods might be distinguished from anexisting reservoir overprint. Flowing transient pressureanalysis was utilized to determine effective permeabilities,contributing lateral lengths, and respective drainage radii.Production and economic performance on each well werenormalized for permeability, productive zone height, porosity,and initial static reservoir pressure, so that examinations intovarious completion processes would be more meaningful.Multiple physical parameters and controllable processvariables were then plotted versus normalized netpresent value.A fully coupled three-dimensional reservoir and wellboresimulator was employed to match historical results andextrapolate conclusions beyond the narrow confines of thetwo projects.Some wells in the study were completed with cementedliners, and others completed with pre-drilled uncementedliners. A direct comparison is made between the twocompletion styles.
机译:来自32口泥盆纪水平井的详细生产数据 对二叠纪盆地进行了研究,以确定 各种完成方法可能与 现有油藏叠印。流动瞬态压力 分析被用来确定有效的渗透率, 贡献侧向长度,以及各自的排水半径。 每口井的产量和经济表现分别为 针对渗透率,生产区高度,孔隙率, 和初始静态储层压力,以便检查成 各种完成过程将更有意义。 多种物理参数和可控过程 然后将变量与归一化净值作图 目前价值。 完全耦合的三维油藏和井眼 模拟器被用来匹配历史结果,并且 推论得出的结论超出了范围的狭窄范围 两个项目。 该研究中的一些井已用胶结剂完成 衬板,以及其他带有预钻孔未粘固剂的衬砌 班轮。两者之间进行了直接比较 完成样式。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号