STREAMLINING INITIATIVES AND MANAGEMENT TOOLS TO REDUCE ENVIRONMENTAL RESTORATION PROJECT COSTS AND SCHEDULES

机译:简化计划和管理工具以减少环境恢复项目的成本和时间表

获取原文

摘要

Increasing costs in environmental restoration activities combined with increasing public skepticism regarding the ability to make progress toward cleanup has led several agencies in the United States to seek solutions through streamlining initiatives. One of the most successful of these initiatives was developed by the US Department of Energy, and later adapted by the U.S. Army for application at their sites. The core of the initiative is the articulation of what are called the Principles of Environmental Restoration. These principles, based on extensive field experience and successful project management, draw on the flexibility contained in the underpinnings of current U.S. environmental restoration program (CERCLA and RCRA (HSWA)) streamlining initiatives. The principles are supported and applied at environmental restoration projects through a set of tools that assist project decision makers in developing problem statements, organizing and communicating site data, identifying data needs (versus data gaps), selecting likely response actions early on, and determining the most appropriate uncertainty management strategy. These management tools are then used to track progress, modify decisions, evaluate cleanup strategies, and communicate uncertainties and other key project information to internal and external audiences throughout the life of the project. The four Principles of Environmental Restoration are: 1. Developing effective communication and cooperation with a Project Management Team (PMT) is essential; 2. Clear, concise, and accurate problem identification and definition are critical; 3. Early identification of likely response actions is possible, prudent, and necessary; and 4. Uncertainties are inherent and will always need to be managed. The principles are presented at sites in a variety of ways, including facilitated workshops focused on very specific restoration challenges, technical reviews focused on specific remediation decisions, and site-wide programmatic evaluation of how the remediation process is being implemented. While the principles do not present new concepts in and of themselves, they provide the framework that encourages the project management team to focus their attention on key decisions that have to be made in order to reach their remediation objectives. The continued emphasis on decisions and data needed to make these decisions is the basis for moving forward. The focus on decisions, in combination with the emphasis on communication and cooperation among all key decision makers at a site has resulted in protective solutions with significant economies and acceleration. Sites report dramatic improvements not only in cost and schedule reduction (ranging from a few months to several years reduction in overall project schedule), but also in the ability of the site personnel to communicate effectively with their management and with the environmental regulatory community to ensure that the most effective strategy is being employed at their sites.
机译:环境恢复活动的成本不断增加,加上公众对清理工作取得进展的能力越来越持怀疑态度,这导致美国的多个机构通过精简计划寻求解决方案。这些举措中最成功的一项是由美国能源部制定的,后来由美国陆军进行了修改,可在其现场应用。该倡议的核心是阐明所谓的环境恢复原则。这些原则基于广泛的现场经验和成功的项目管理,借鉴了当前美国环境恢复计划(CERCLA和RCRA(HSWA))精简计划的基础所包含的灵活性。这些原则在环境恢复项目中通过一套工具得到支持和应用,这些工​​具可以帮助项目决策者制定问题陈述,组织和交流站点数据,识别数据需求(相对于数据缺口),尽早选择可能的响应措施并确定解决方案。最合适的不确定性管理策略。然后,这些管理工具将用于跟踪进度,修改决策,评估清理策略,并在项目的整个生命周期内将不确定性和其他关键项目信息传达给内部和外部受众。恢复环境的四项原则是:1.与项目管理团队(PMT)建立有效的沟通与合作至关重要。 2.清晰,简洁,准确的问题识别和定义至关重要; 3.尽早,可能和谨慎地确定可能的响应措施是必要的; 4.不确定性是内在的,将始终需要加以管理。在现场以各种方式介绍了这些原则,包括针对非常具体的修复挑战的便利研讨会,针对特定修复决策的技术审查以及对修复过程实施方式的整个站点的计划性评估。尽管这些原则本身并没有提出新的概念,但它们提供了一个框架,鼓励项目管理团队将注意力集中在为实现补救目标而必须做出的关键决策上。继续强调决策和做出这些决策所需的数据是前进的基础。对决策的关注,再加上对站点中所有关键决策者之间的沟通与合作的重视,共同导致了具有显着经济效益和加速发展的保护性解决方案。站点报告不仅在成本和进度减少(从总体项目进度的减少到几个月到几年的减少)方面,而且在站点人员与他们的管理层和与环境法规界进行有效沟通以确保他们的站点正在采用最有效的策略。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号