【24h】

GOING UNDERGROUND AT THE SELECTED SITE FOR SITE CONFIRMATION

机译:在选定的场地地下进行场地确认

获取原文

摘要

The long-term programme aimed at selection of a site for a deep repository was initiated in Finland in 1983. This programme has come to end and a new phase aimed at implementation of the geological disposal of spent fuel has been started. In this new phase the first milestone is the application for a construction license for the disposal facility around 2010 and thereafter, as a second step, the operation license in 2020. To fulfil the needs for detailed design of the disposal system, an underground rock characterisation facility, "ONKALO", will be constructed at the representative depth at Olkiluoto. The excavation of this facility will start the work for underground characterisation, testing and demonstration which is planned to be a continuous activity throughout the whole life cycle of the deep repository.
机译:于1983年在芬兰启动了旨在选择深层处置库地点的长期计划。该计划已经结束,并开始了实施乏燃料地质处置的新阶段。在这个新阶段中,第一个里程碑是在2010年左右为处置设施申请建筑许可,此后第二步是在2020年获得运营许可。为满足处置系统详细设计的需求,需要进行地下岩石表征设施“ ONKALO”将在Olkiluoto的代表深度建造。该设施的开挖将开始进行地下表征,测试和演示工作,该工作计划在深层存储库的整个生命周期中是一项连续的活动。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号