MONITORING PROCEDURES FOR THE APPLICATION OF THE CONCEPT OF PRE-ALLOCATION OF TOTAL FLOAT

机译:监测程序,以应用总浮法的预分配概念

获取原文

摘要

With the increasing complexity in construction projects, monitoring project schedule and managing projects effectively is becoming increasingly important. Most projects being deadline oriented, timely completion becomes a must. A schedule overrun is never predicted at the start of the project. As per the current scheduling practices, float is considered free. It is an expiring resource. To handle the issue of total float management more efficiently, a new concept of total float management is proposed as an effort towards a more fair and equitable system. This concept respects the dynamic nature of construction projects and recognizes float to be an asset for both parties. The new concept proposes to allocate float in the ratio 50:50 between the parties at the start of the project. Monitoring procedures were developed to facilitate monitoring a project schedule closely as well as help in keeping track of the allowable total float for the owner and the contractor.
机译:随着建筑项目的复杂性越来越多,监测项目时间表和管理项目有效变得越来越重要。大多数项目截止日期为导向,及时完成变为必要。从未在项目开始时预测计划溢出。根据当前的调度实践,浮动被认为是免费的。它是一个到期的资源。为了更有效地处理总浮动管理的问题,提出了全面浮动管理的新概念作为更公平和公平的制度的努力。这一概念尊重建设项目的动态性质,并承认浮动成为双方的资产。新概念建议在项目开始时50:50的比例分配浮子。制定监测程序以便于密切监测项目进度,以及帮助跟踪所有者和承包商的允许的总浮动。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号