首页> 外文会议>Structures congress >Main Street Bridge Project, Danville, VA Open Spandrel Concrete Arch Bridges: New and Old
【24h】

Main Street Bridge Project, Danville, VA Open Spandrel Concrete Arch Bridges: New and Old

机译:大街桥工程,丹维尔,VA开放式雪兰林混凝土拱桥:新旧

获取原文

摘要

Topic/subtopic: Transportation (Bridges)/Rehabilitation Target Audience: Bridge engineers/design practitioners, builders, educators and officials; professional and amateur historians; those interested in bridge design aesthetics. Take-Away Lessons from this Presentation: Two contrasting design approaches for arch bridges; an aesthetic program for a bridge rehabilitation design that is responsive to its historic context; and an interesting story about a historically significant bridge. The purpose of this project was to improve the Main Street crossing of the Dan River in the City of Danville. The existing seven-span, 823-foot long, four-lane concrete arch bridge carrying Main Street was designed by Daniel Luten and constructed during the late 1920s. It had deteriorated significantly and was in need of rehabilitation or replacement. Major traffic capacity improvements were needed on the crossing as well as the intersection at the north end of the bridge. Additional objectives were to maintain the historic integrity of the existing bridge and to affect as few businesses and residences as possible. The bridge is a contributing element to four historic districts that surround it. The Main Street/Riverside Drive intersection immediately north of the bridge was widened to accommodate future year traffic. Additional southbound lanes were constructed on a new two-lane concrete arch bridge located west of the existing bridge. Each span includes four parallel arches. The floor system is framed with AASHTO girders spanning from arch crowns to the adjoining substructure. The historic identity of the existing Main Street bridge was maintained by rehabilitating it in place. Existing concrete arches and piers were repaired while the spandrel columns , floor system and deck were replaced, in kind, with cast-in-place concrete. Its appearance will remain similar to the existing bridge by virtue of the arches and piers remaining. Architecturally designed form liners and pigmented concrete were also utilized. The intent of the aesthetic design is for both bridges to share common elements while having their own identity. A custom designed, open handrail was constructed on both bridges. The project was completed during 2006.
机译:主题/霸权:运输(桥梁)/康复目标受众:桥梁工程师/设计从业者,建筑商,教育工作者和官员;专业和业余历史学家;那些对桥梁设计美学感兴趣的人。来自此演示文稿的外卖课程:拱桥的两个对比设计方法;桥梁康复设计的美学计划,响应其历史背景;以及关于历史上重要的桥梁的有趣故事。该项目的目的是改善丹维尔市丹河的主要街道交叉。现有的七跨度,823英尺长的四车道混凝土拱桥携带主要街道由Daniel Luten设计并在20世纪20年代后期建造。它显着恶化,需要康复或更换。在交叉路口以及桥梁北端的交叉口需要大量交通能力。额外的目标是保持现有桥梁的历史诚信,并尽可能地影响少数企业和居所。这座桥是一个围绕它的四个历史区的贡献元素。主要的街道/河沿在桥梁北部的交叉路口加宽,以适应未来的年度交通。额外的南行车道被建造在位于现有桥梁以西的新的双车轮混凝土拱桥上。每个跨度包括四个平行拱门。地板系统与距离拱冠跨越的AASHTO梁框架到相邻的子结构。通过将现有的主要街道桥梁恢复到位,维护了现有的主要街道桥的历史身份。在施工柱,地板系统和甲板被取代,实物塑造混凝土时,修复了现有的混凝土拱门。凭借剩下的拱门和码头,它的外观将保持与现有的桥相似。建筑设计的衬垫和着色混凝土也被利用。审美设计的目的是两个桥梁,同时拥有自己的身份同时分享普通元素。在两个桥梁上建造了一款定制的开放式扶手。该项目于2006年完成。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号