Using state-of-the-art design methods and employing "lessons learned" from other projects, the $48M rehabilitation of the Rankin Bridge was complicated and complex. A four-lane, twelve-span, 2400' deck truss spanning the Monongahela River in Allegheny County, PA, originally constructed in 1949, the structure offers a notable example of steel bridge technology from that era - riveted construction, deck trusses, and girder-type approach spans. The rehabilitation project began in late 2008 and was substantially completed in December 2010. It contained elements typically associated with repairing and upgrading a 60-year-old bridge; i.e., deck replacement and widening, expansion dam replacement, repair of deteriorated steel and concrete components, and repainting. It also presented design and construction challenges that included the following: 1. Truss Gusset Plates - inspection, load rating, retrofit. 2. Truss Strengthening (49 members) - use of several analytical methods (ASD vs. LFD); design; installation. 3. Dead Load Reduction - modified typical section (lane and sidewalk configurations); use of lightweight concrete. 4. Global Redundancy - addition of supplemental devices at tie-downs of anchor spans and pin/hanger ends of suspended truss span. 5. Truss Rocker Bearing Retrofit - addition of seismic backup devices. 6. Phased (half-width) replacement of a two-girder approach span using a temporary girder. 7. Widening of an abutment and wingwall with tangent caissons to accommodate the wider deck. 8. Stabilizing both abutments and one pier with the installation of passive tie-back anchors.
机译:使用最先进的设计方法和采用“经验教训”从其他项目中,Rankin Bridge的4800万美元康复康复复杂,复杂。四车道,十二座,2400英寸甲板桁架遍布阿勒格纳尼县的Monongahela河,PA最初由1949年建造,该结构提供了一个值得注意的钢桥技术的例子,从该时代铆接施工,甲板桁架和梁-Type方法跨度。康复项目始于2008年底,并于2010年12月完成。它包含了与修理和升级60岁的桥梁有关的因素;即,甲板更换和扩大,扩展坝更换,钢钢和混凝土部件的修复,以及重新粉刷。它还介绍了包括以下内容的设计和施工挑战:1。桁架角撑板 - 检查,负荷等级,改造。 2.桁架加强(49成员) - 使用几种分析方法(ASD与LFD);设计;安装。 3.死载减少 - 修改典型部分(车道和人行道配置);使用轻质混凝土。 4.全球冗余 - 在锚跨度的束缚跨度束缚下添加补充装置,悬挂桁架跨度的销/吊架端。 5.桁架摇臂轴承改装 - 添加地震备用装置。 6.使用临时梁替换(半宽度)更换双梁接近跨度。 7.使用切割沉箱扩展抵架和翼墙,以容纳更广阔的甲板。 8.稳定双支座和一个码头,安装被动绕锚。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号