首页> 外文会议>Structures congress >The Influence of Engineering Organization on Design and Construction Processes at Tennessee Valley Authority Dams of the 1930s
【24h】

The Influence of Engineering Organization on Design and Construction Processes at Tennessee Valley Authority Dams of the 1930s

机译:工程组织在20世纪30年代田纳西州谷权威坝设计和施工过程的影响

获取原文

摘要

This study examines engineering design processes and organization at the Tennessee Valley Authority in its early years from 1933 to 1936. During this time, Norris and Wheeler dams were constructed and plans and designs were begun for several additional dams. The TVA experience provides insights into how design processes evolved and were managed in a large engineering organization. A particularly innovative decision was the choice to build TVA dams by force account, i.e. by hiring their own employees, rather than by selecting contractors through a traditional bidding process. TVA engineers believed this approach would reduce overall design and construction costs, as well as reduce time to completion. Case studies of civil engineering history, like this one, provide an important tool for introducing students to design processes and engineering decision making.
机译:本研究在1933年至1936年的早期初期审查了田纳西州谷权威的工程设计流程和组织。在此期间,诺里斯和惠斯水坝被建造,有几个额外的水坝开始了计划和设计。 TVA体验提供了探讨设计过程如何进化的并且在大型工程组织中管理。特别是创新的决定是通过强制账户建立TVA水坝的选择,即通过雇用自己的员工,而不是通过传统的竞标过程选择承包商。 TVA工程师认为这种方法会降低整体设计和施工成本,以及缩短完成时间。像该土木工程历史的案例研究,就像这一点一样,为学生介绍设计流程和工程决策,提供了一个重要的工具。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号