首页> 外文会议>International conference on coastal engineering;ICCE96 >An improved design method for the riprap of earthfill dams of large reservoirs
【24h】

An improved design method for the riprap of earthfill dams of large reservoirs

机译:大型水库堆石坝翻石的改进设计方法

获取原文

摘要

Since impounding of hte various reservoirs of the La Grande Complex in northern Quebec,the riprap of wseveral dams and dykes suffered some damage dienergie de la Baie James (SEBJ) in january 1992 to review the riprap design and design method,for the riprap of earthifill dams of large researvoirs,is proposed based on four years of intensive studies and fifteen years of fied data.large scale model tests with irregular waves ocmpoeted the studies.
机译:自从在魁北克北部的La Grande Complex的各种水库蓄水以来,数座水坝和堤坝的石方在1992年1月遭受了Diergye de la Baie James(SEBJ)的破坏,以审查土石方的石方和设计方法。基于四年的深入研究和十五年的实地数据,提出了大型水库坝。大型模型试验用不规则波浪进行了研究。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号