The 2nd campaign of pohang No.2 B.F. and its relining plan for the 3rd campaign

机译:浦项2号B.F.的第二次战役及其第三次战役的改型计划

获取原文

摘要

Pohang No.2 blast furnace will be relined on April 1997. This project will spend 105 days in preparation for next campaign. We have achieved successful performance during 13 years 11 months since it came to operate from now on.. Pohang No 2 B.F. has the first beel-less top charging equipment which made great contribution to technical innovation of the burden profile distribution in POSCO. No. 2 B.F has 2550 m~3 of inner volume, 11 m of hearth diameter, twenty-eight tuyeres, two tap holes, and cooling plate system. Material charging equipment is the parallel Bunker type composed of 2 charging top bunkers. And it has four Cowper Hot Stoves, dust catcher and two ventury scrubbers for blast furnace top gas cleaning system.
机译:浦项第二高炉将在1997年4月改建。该项目将花费105天的时间为下一次战役做准备。从现在开始运营以来,我们已经在13年11个月的时间里取得了成功的业绩。浦项2号B.F.拥有首台无甜菜碱顶部装料设备,为POSCO负荷分布的技术创新做出了巨大贡献。 2号地下室的内部容积为2550 m〜3,炉膛直径为11 m,有28个风口,两个出铁孔和冷却板系统。物料装料设备是由两个料斗顶部料仓组成的平行料仓类型。它具有四个考珀热炉,除尘器和两个用于高炉顶部气体清洁系统的通风洗涤器。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号