These days generation of coal ash in India is about 70 million tonnes per year from coal based installed capacity of about 60,000 MW, however the total installed capacity is 81,164 MW. The National Thermal Power Corporation Ltd. (NTPC) alone produce every year about 17 million tonnes of coal ash, out of 13 coal based stations having about 12,000 MW coal based installed capacity. The total installed capacity of NTPC including gas based stations is about 16,085 MW.
机译:这些天来,印度每年的粉煤灰发电量约为7,000万吨,其中煤基装机容量约为60,000 MW,但总装机容量为81,164 MW。在13个燃煤电站中,每年仅生产国家热电有限公司(NTPC)的煤灰就达1,700万吨,这些煤电站的装机容量约为12,000 MW。 NTPC包括加油站的总装机容量约为16,085 MW。