Tri-Met is nearing completion of the 18-mile Westside LRT Project, which includes a 6-mile segment serving the City of Hillsboro. For the in street section of the trackway in downtown Hillsboro, the contractor submitted an alternative proposal for the track structure. A rubber boot proposal was submitted and accepted by the owner for the in street design portion of the trackway (Figure 1). The design is the only existing rail boot system which is now partly installed and tested with full isolation properties.The track structure houses the rail in an extruded rubber boot which provides full isolation, in accordance with current established electrical isolation criteria, and noise and vibration attenuation. The rail and boot is fastened into a concrete track slab by an elastic spring clip and isolator assembly for holding the rail to elevation and gauge. An infill slab between the rails and on the outside is being constructed with colored concrete and surface profiled. The boot system for a standard LRT system has been developed for this project using materials engineered for full isolation protection, cost efficiency and simplicity of installation. This will have a significant benefit to the project in terms of cost and time schedule, and is considered to be a serious contender for other transit-related rail works.This paper will address the following aspects of the design and implementation of this system:1. Boot extrusion.2. Drainage issues and isolation problems.3. Vibration and noise attenuation.4. Isolation requirements and test results.5. Boot and trackway costs and cost comparisons with other designs.6. Construction installation and presentation.
机译:Tri-Met的18英里西区轻轨项目即将完成,其中包括为希尔斯伯勒市提供服务的6英里路段。对于希尔斯伯勒(Hillsboro)市区轨道内的街道部分,承包商提交了有关轨道结构的替代方案。橡胶靴提案已提交并被所有者接受,用于轨道的街道内设计部分(图1)。该设计是现有的唯一铁路引导系统,现在已部分安装并通过完全隔离属性进行了测试。 轨道结构将轨道容纳在挤压的橡胶靴中,该橡胶靴根据当前建立的电气隔离标准提供完全隔离,并具有噪音和振动衰减功能。轨道和靴子通过弹性弹簧夹和隔离器组件固定在混凝土轨道板中,以将轨道保持在高程和轨距上。正在用彩色混凝土和表面成型的钢轨之间和外部的填充板。已为该项目开发了用于标准LRT系统的引导系统,该引导系统使用了经过工程设计的材料来实现完全隔离保护,成本效益和安装简便性。就成本和时间表而言,这将对该项目带来重大好处,并且被认为是其他与运输相关的铁路工程的有力竞争者。 本文将解决该系统设计和实现的以下方面: 1.靴子挤压。 2.排水问题和隔离问题。 3.振动和噪音衰减。 4.隔离要求和测试结果。 5.引导和轨道成本以及与其他设计的成本比较。 6.施工安装和介绍。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号