Park Road Over/Under Tunnels: Problems and Solutions

机译:柏道上/下隧道:问题与解决方案

获取原文

摘要

The Park Road Tunnels is a 3220-foot connector between two stations in an over/under configuration down a narrow public right-of-way. An over/under configuration was chosen to avoid the necessity of taking a church and 15 residences. Other design problems included known hydrocarbon contamination and squeezing a double deck fan shaft and emergency exit into a small footprint. This project is one of five that comprise the Mid-City E Route segment of the Washington Metropolitan Area Transit Authority's (WMATA) effort to fast track construction of the remaining 13.5 miles of the systemGeology for this project is soft ground with the upper tunnel predominantly in sands and with the lower tunnel in sands, clays, and decomposed rock. Ground modification was designed and split between an observational dewatering system and chemical grout injections. Also, an open face digger shield was specified for both tunnels.As construction progressed, it became apparent that the designed observational dewatering system had failed. Tunneling commenced on the lower tunnel as specified and ran into a flowing ground condition almost immediately. Although the contract provided for partnering, the contractor and WMATA had developed a deep sense of mistrust in each other. The problem was referred to a Disputes Review Board who found a offering site condition existed but that neither WMATA ncr the section designer should be held at fault. An independent consultant, retained by WMATA also found that neither WMATA nor the section designer could have reasonablely anticipated the ground behavior during the design process.WMATA, working with consultants and the contractor, agreed on a stepped methodology to overcome the differing site condition; first by a hybrid system of chemical grout injections and additional dewatering wells; and second by abandoning most of the dewatering effort and concentrating on chemicalgrout injections. Tunneling is complete and final liner concreting is underway. The cost in time is approximately 14 months and the cost in dollars did not quite double the bid price of the contract. From WMATA's point of view, the most important part is that the problem was solved and the segment will be complete on time and within budget.
机译:Park Road隧道是一个狭窄的公共道路,上下两部分之间的3220英尺长的连接器,呈上下配置。选择上/下配置以避免需要教堂和15座住所。其他设计问题包括已知的碳氢化合物污染以及将双层风扇轴和紧急出口挤压到较小的占地面积。该项目是华盛顿大都会区运输局(WMATA)努力快速完成系统其余13.5英里建设的中城E线部分的五个项目之一。 该项目的地质条件是软土,上部隧道主要位于沙子中,下部隧道则位于沙子,粘土和分解的岩石中。设计了地面改良工程,并将其分为观察性脱水系统和化学灌浆技术。另外,为两个隧道都指定了一个露天挖掘者盾牌。 随着建设的进行,很明显,设计的观测脱水系统已经失效。隧道在指定的下部隧道开始施工,并几乎立即进入流动的地面状态。尽管合同规定了合作伙伴关系,但承包商和WMATA彼此之间已经产生了深深的不信任感。该问题已转交给争议审查委员会,该委员会发现存在提供场地的条件,但无论是WMATA ncr还是部门设计者都不应有过错。由WMATA聘请的独立顾问还发现,WMATA或路段设计人员都无法合理预期设计过程中的地面行为。 WMATA与顾问和承包商合作,商定了一种逐步的方法来克服现场条件的差异;首先是化学灌浆和额外的脱水井的混合系统。其次是放弃大部分脱水工作,而专注于化学 灌浆注射。掘进工作已经完成,最后的衬砌混凝土正在进行中。时间成本大约为14个月,以美元计算的成本并没有使合同的竞标价格高出一倍。从WMATA的角度来看,最重要的部分是问题已得到解决,该细分市场将在预算范围内按时完成。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号