首页> 外文会议>Rapid excavation and tunneling conference >Design and construction of the marcapomaccoha III water supply project in the high andes, peru
【24h】

Design and construction of the marcapomaccoha III water supply project in the high andes, peru

机译:秘鲁高安斯马加马省水印III供水项目的设计与施工

获取原文

摘要

In the high Andes of Peru, two tunnels are being constructed totaling nine kilometers in length at an elevation of over 4,500 meters. The tunnels convey freezing and crystal-clear waters from rainfalls, streams, and lakes for the consumption of Lima. The drill and blast 3-meter wide by 4-meter high tunnels are being driven from both ends through folded and sheared volcanic tuff, andesite, agglomerate, and limestone, where groundwater inflow is high. This paper describes the design geological and groundwater inflow investigations and construction.
机译:在秘鲁的高andes中,两个隧道在长度为4500米的高度时长9千米。隧道从降雨,溪流和湖泊传达冷冻和晶状水,以消耗利马。通过折叠和剪切的火山凝灰岩,安德石,附聚物和石灰岩,从两端驱动4米高的4米高隧道3米宽的钻孔和爆破。本文介绍了设计地质和地下水流入调查和建设。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号