首页> 外文会议>Rapid excavation and tunneling conference >A review of the grouting on line of the cairo metro
【24h】

A review of the grouting on line of the cairo metro

机译:开罗地铁线路注浆综述

获取原文

摘要

This paper presents a review of the grouting works of Line 2 of the Greater Cairo Metro System. The Nile River alluvial deposits underlying this ancient city provided for a challenging and sometimes difficult grouting project. Permeation grouting using state-of-the-art computerized grouting technqieus, as well as extensive ground treatment by jet grout, was performed for soil consolidation and/or groundwater control. During the project, over 425,000 m~3 of ground was treated, requiring 1.4 million linear meters of drilling and PVC injection pipel, 54, 000 m~3 of bentonite cement and 230,000 m~3 of chemical and mineral grout. In addition, over 70,000 m~3 of ground was treated using the jet grout method. Relative to major international transportation projects, the grouting works for Line 2 of the Cairo Metro represent one of the largest worldwide grouting endeavors to date.
机译:本文介绍了大开罗地铁系统2号线的注浆工作。这座古城下方的尼罗河冲积物为一项充满挑战的,有时是困难的灌浆项目提供了条件。使用最先进的计算机灌浆技术进行渗透灌浆,并通过喷射灌浆进行广泛的地面处理,以进行土壤固结和/或控制地下水。在该项目中,处理了超过425,000 m〜3的地面,需要140万线性米的钻探和PVC注入管,54,000 m〜3的膨润土水泥以及23万m〜3的化学和矿物灌浆。另外,使用喷射灌浆法处理了超过70,000 m〜3的地面。相对于大型国际运输项目,开罗地铁2号线的灌浆工程是迄今为止全球最大的灌浆工作之一。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号