A studying and scheme implement in improving the transmission capacity of East-HeiLongjiang power grid

机译:提高黑龙东电网输电能力的研究与方案实施

获取原文

摘要

This article general introduce the background of the stabilization control project that improve the provide ability for the east of Heilongjiang Province, it is analysis the static security problem and the dynamic stabilization problem which prevent the power flow offer from the east of Heilongjiang Province, and advance the stabilization-control strategy, authorized the control project, also it make out the explain to the actualize and the control effect of the project. This project is one of the important job of the improve the power grid transportation ability for the NorthEast China Grid, and it is startup in the end of 2004, and begin to launch into use in 5/23/2005.
机译:本文总体介绍了提高黑龙江省东部地区供电能力的稳定控制项目的背景,分析了阻碍黑龙江省东部地区供电潮流的静态安全问题和动态稳定问题,并进行了深入研究。稳定控制策略,授权控制项目,并对项目的实施和控制效果做出解释。该项目是提高东北电网电网运输能力的重要工作之一,于2004年底启动,并于2005年5月23日开始投入使用。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号