首页> 外文会议> >Improvement of RHIC warm beam vacuum for high intensity operation
【24h】

Improvement of RHIC warm beam vacuum for high intensity operation

机译:改善RHIC高强度操作的热束真空度

获取原文

摘要

With increasing ion beam intensity during recent RHIC operations, pressure rises of several decades were observed at a few warm vacuum sections. Improvement of the warm sections has been carried out in last year's shutdown. Extensive in-situ bakes, additional UHV pumping, electron detectors and beam tube solenoids have been implemented. Vacuum monitoring and interlock were enhanced to reduce premature beam aborts. The effectiveness of these measures in reducing the beam induced pressure bumps and in increasing the vacuum system reliability are discussed and summarized.
机译:在最近的RHIC操作中,随着离子束强度的增加,在几个温暖的真空区域观察到了几十年的压力上升。去年的停工已经对暖节进行了改善。已经实现了广泛的原位烘烤,额外的特高压泵送,电子探测器和束管螺线管。增强了真空监控和互锁功能,以减少光束过早中断。讨论并总结了这些措施在减少射束引起的压力冲击和增加真空系统可靠性方面的有效性。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号