首页> 外文会议>Materials engineering for advanced technologies >Feasibility Analysis and Status of Shallow Pipe-Jacking Technology in Urban Drainage Systems
【24h】

Feasibility Analysis and Status of Shallow Pipe-Jacking Technology in Urban Drainage Systems

机译:浅埋管技术在城市排水系统中的可行性分析及现状

获取原文
获取原文并翻译 | 示例

摘要

Considering the current domestic situation that there is no provision for shallow pipe-jacking (with overburden soil layer not thicker than 3 m and 1.5 limes of the pipe external diameter) in the existing water supply and drainage pipeline engineering design and construction specifications, a comprehensive analysis and discussion, based on the actual domestic condition, is made on the feasibility of shallow pipe-jacking technology in urban drainage systems. The problems confronting the shallow pipe-jacking technology theory research are also analyzed and the research status of shallow curve pipe-jacking technology is introduced.
机译:考虑到目前的国内情况,在现行给排水管道工程设计和施工规范中没有规定浅层顶管(覆土层厚度不超过3 m,管道外径为1.5石灰)。根据国内实际情况,对浅管顶管技术在城市排水系统中的可行性进行了分析和讨论。分析了浅管顶管技术理论研究中遇到的问题,并介绍了浅管顶管技术的研究现状。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号