首页> 外文会议>Journal of Physics:Conference Series Volume 112, The Fifth International Conference on Inertial Fusion Sciences and Applications(IFSA2007) >Maintenance Method and its Critical Issues for a Fast-IgnitionLaser Fusion Reactor based on a Dry Wall Chamber
【24h】

Maintenance Method and its Critical Issues for a Fast-IgnitionLaser Fusion Reactor based on a Dry Wall Chamber

机译:基于干壁腔的快燃激光聚变反应堆的维修方法及其关键问题

获取原文
获取原文并翻译 | 示例

摘要

The neutronics analysis has been carried out for feasibility study of the FALCON-Drnconcept by Monte Carlo N-paticle transport code (MCNP), in order to inspect the coolingrnperformance of in-vessel and ex-vessel components, and a connection pipe between VacuumrnVessel and reactor room. The nuclear heating rate in the Vacuum Vessel was at the same levelrnas that of NBI duct of the ITER. The temperature of the connection pipe was found to be 345℃,rnwhich was smaller than the melting point of structure materials (F82H). Moreover, thernradiation damage of the final optics was also investigated. We propose a sliding changerrnconcept for replacement. This method could be adapted for the replacement of one FPY cyclernin the final optics system.
机译:为检查FALCON-Drnconcept的蒙特卡罗N型运输代码(MCNP)的可行性,进行了中子学分析,以检查容器内和容器外组件以及VacuumrnVessel与容器之间的连接管的冷却性能。反应室。真空容器中的核加热速率与ITER的NBI管道处于相同水平。发现连接管的温度为345℃,低于结构材料(F82H)的熔点。此外,还研究了最终光学器件的辐照损伤。我们提出了一种可替换的滑动式变更概念。该方法可适合于替换最终光学系统中的一个FPY循环。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号