首页> 外文会议>ISA Water amp; Wastewater Instrumentation Symposium; 20030820-20030821; Lake Buena Vista,FL; US >A Review and Discussion of Issues Related to Long- Term Planning for Supervisory Control and Data Acquisition and Instrumentation and Control Systems for a Multi-phase, Multi-year Project in a Wastewater Facility
【24h】

A Review and Discussion of Issues Related to Long- Term Planning for Supervisory Control and Data Acquisition and Instrumentation and Control Systems for a Multi-phase, Multi-year Project in a Wastewater Facility

机译:废水设施中多阶段,多年项目的监督控制,数据采集和仪表与控制系统的长期规划相关问题的讨论和讨论

获取原文
获取原文并翻译 | 示例

摘要

This paper reviews and discusses the issues related to long term planning for Supervisory Control and Data Acquisition (SCADA) and Instrumentation and control (I&C) systems for multi-phase multi-year projects. This paper investigates some of the reasons for multi-phase multi-year projects such as budget issues, process issues, schedule issues, and regulatory requirement issues. In addition, this paper reviews and discusses the results of a multi-phase multi-year project as they relate to SCAD A and I&C systems for a water/wastewater facility. Issues include hardware and software upgrades, personnel training, personnel staffing, design issues and consultant and contractor issues.
机译:本文回顾并讨论了与多阶段多年项目的监督控制和数据采集(SCADA)和仪表与控制(I&C)系统的长期计划有关的问题。本文研究了多阶段多年项目的一些原因,例如预算问题,流程问题,进度问题和法规要求问题。另外,本文回顾并讨论了一个多阶段的多年项目的结果,这些结果与水/废水处理设施的SCAD A和I&C系统有关。问题包括硬件和软件升级,人员培训,人员配备,设计问题以及顾问和承包商问题。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号