THERMAL DESORPTION TREATMENT OF DIOXIN CONTAMINATED SOIL AT THE FORMER ALLIED FEEDS SITE, SYDNEY AUSTRALIA

机译:澳大利亚悉尼前联合饲料场对二恶英污染土壤的热脱附处理

获取原文
获取原文并翻译 | 示例

摘要

The former Allied Feeds site is located on the Rhodes Peninsula adjacent to the Homebush Bay, in Sydney, Australia. The adjacent Lednez site was historically used for manufacturing a range of chemicals, including tar, explosives and chlorinated compounds. Through these activities, both sites and the Homebush Bay were contaminated with dioxins/furans, chlorobenzenes, chlorophenols and organochlorine pesticides (OCPs). Both properties are currently being remediated for open space, medium and high-density residential use, and commercial development. The Lednez site remediation activities also include dredging and treating contaminated sediments from Homebush Bay. Combined, these projects represent the largest dioxin remediation project that has been undertaken in the world using a thermal treatment technology.rnOn the Allied Feeds site, about 175,000 tonnes of dioxin-contaminated soil has been treated using a directly-heated thermal desorption (DTD) plant. The project is significant because: (1) it is the first large-scale thermal remediation project conducted in Australia, (2) the project has been implemented at a time when local environmental regulations were evolving, (3) the feed material contains high concentrations of dioxins/furans and potential dioxin/furan precursor compounds (e.g. chlorophenols and chlorobenzenes), (4) the feed material contains a high proportion of fine-grained spent lime with a high moisture content, (5) the project is being conducted adjacent to a major waterway in a highly developed urban area, and (6) the site is being redeveloped for residential and commercial use concurrently with remediation activities.rnThe project has included a number of regulatory, technical and logistical challenges, including the development of "best practices" regulatory standards, control of fugitive emissions, processing of a difficult and complex feed material, and compliance with stringent environmental requirements. This paper discusses a number of the project issues and the results of the regulatory compliance test program and the production operations phase of the project.
机译:以前的联合饲料厂位于澳大利亚悉尼罗德半岛的霍姆布什湾附近。相邻的Lednez站点在历史上曾被用于制造各种化学品,包括焦油,炸药和氯化化合物。通过这些活动,两个场址和霍姆布什湾都被二恶英/呋喃,氯苯,氯酚和有机氯农药(OCP)污染。目前,这两种属性都已被修复,以用于开放空间,中密度和高密度住宅用途以及商业开发。 Lednez场地的修复活动还包括疏Home和处理Homebush湾的受污染沉积物。这些项目加在一起代表了世界上使用热处理技术进行的最大的二恶英修复项目。在联合饲料厂,使用直接加热的热脱附(DTD)处理了约17.5万吨被二恶英污染的土壤厂。该项目之所以具有重大意义,是因为:(1)这是澳大利亚进行的第一个大规模热修复项目;(2)该项目是在当地环境法规不断发展的同时实施的;(3)饲料中所含的高浓度二恶英/呋喃和潜在的二恶英/呋喃前体化合物(例如氯酚和氯苯),(4)进料中包含高比例的高水分细颗粒废石灰,(5)该项目正在毗邻(6)该场地正在进行整治,同时与整治活动同时进行了住宅和商业用途。rn该项目包括许多监管,技术和后勤方面的挑战,包括制定“最佳实践”法规标准,对逃逸排放物的控制,对困难而复杂的饲料原料的处理以及对严格环境要求的遵守。本文讨论了许多项目问题以及法规遵从性测试计划和项目的生产运营阶段的结果。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号