UPGRADING SAFETY OF UNITS 5 AND 6 AT KOZLODUY NUCLEAR POWER PLANT WITH THE USE OF PROBABILISTIC SAFETY ASSESSMENT RESULTS AND OTHER RELEVANT STUDIES

机译:使用概率安全性评估结果和其他相关研究来提高科兹洛杜伊核电站5号和6号机组的安全性

获取原文
获取原文并翻译 | 示例

摘要

A programme for safety upgrading of Kozloduy NPP Units 5 and 6 has been developed [1]. The experience of the existing studies (design deficiencies found during the operation), as well as the recommendations given by European and international organizations for upgrading of the units to an acceptable safety level were taken into account. The programme also includes evaluation of the economic effectiveness of the proposed solutions and modifications. The main principle for the programme development is in structuring the proposed measures in accordance with the safety functions of the systems. Another criterion for evaluation of the modifications or proposals is taken from the results of the probabilistic safety assessment (PSA) Level 1 studies already performed or recently performed with internal and external accident initiators, corrections of the Safety Analysis Report (SAR), etc. A detailed time schedule was developed for different programme measures. The programme was used as a basis for several international projects for Units 5 and 6.
机译:已经制定了Kozloduy NPP 5号和6号机组安全升级计划[1]。考虑了现有研究的经验(操作过程中发现的设计缺陷),以及欧洲和国际组织针对将设备升级到可接受的安全级别而提出的建议。该计划还包括对提出的解决方案和修改方案的经济有效性进行评估。程序开发的主要原则是根据系统的安全功能来构造建议的措施。评估修改或建议的另一条标准来自已经或最近通过内部和外部事故发生者进行的概率安全评估(PSA)1级研究的结果,对安全分析报告(SAR)的更正等。针对不同的计划措施制定了详细的时间表。该程序被用作第5和第6单元几个国际项目的基础。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号