Merits and Demerits of the Inspection System introduced in Construction of City Planning Road: In Case of Crossing Road of the Aioiyama Green Area in Nagoya

机译:在城市规划道路建设中引入的检查制度的优缺点:以名古屋的青山山绿地交叉路为例

获取原文
获取原文并翻译 | 示例

摘要

The Yatomi - Aioiyama line is a city-planning road that was notified in 1957 and subsequently prepared by land readjustments. Currently, approximately 900m of road pass in the inside of the Aioiyama green area has not been constructed.The surveying briefing session for inhabitants was held in July 1992, the project was authorized by the Ministry of Land, Infrastructure and Transport in September 1993, and the project briefing session for inhabitants was held in September 1993. The site purchase has been completed. At the May 2000 briefing session, inhabitants of the area began voicing dissenting demanding the conservation of the natural environment of this green area.The inspector system serves as the third party, independent of both the administration and the inhabitants. Before finalizing the geometric line form of the road to be constructed, some surveys of animals and plants found along the walking trails carried out intensively in the northern area, which is approximately 50 ha, of the Aioiyama green area. The natural environment inspector submitted a plan for changing the geometric line form of the road decided upon by city planning, and it was approved by the city planning council. If the shelter structure or the retaining wall structure is adopted at the location where large slope faces are produced by excavation or landfill, and if the bridge structure is adopted at the place where stream-lines and walking trails intersect, it leads to a reduction of approximately 40% in the areas for which change is planned. Furthermore, approximately 20% of the area to be changed is restored by returning soil to the roof of the shelter.
机译:Yatomi-Aioiyama线是一条城市规划道路,于1957年得到通知,随后通过土地调整进行了准备。目前,尚未在青山山绿地内部建造约900m的道路通行证.1992年7月举行了居民调查简报会,该项目于1993年9月获得了国土交通省的批准。 1993年9月为居民举行了项目简介会。现场购买已经完成。在2000年5月的情况介绍会上,该地区的居民开始表达异议,要求保护该绿地的自然环境。检查员制度是第三方,独立于行政当局和居民。在最终确定将要建造的道路的几何线形式之前,对在步道上发现的动植物进行了一些调查,重点是在相生山绿色地区的北部地区(约50公顷)。自然环境检查员提交了根据城市规划确定的改变道路几何线形的计划,并得到了城市规划委员会的批准。如果在开挖或填埋产生大坡度的地方采用住房结构或挡土墙结构,而在流线与人行步道相交的地方采用桥梁结构,则​​会导致建筑面积减少。在计划进行更改的区域中,大约40%。此外,通过将土壤返回到庇护所的屋顶,可以恢复大约20%的待改变区域。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号