首页> 外文会议>International ETG Congress 2017 >Development of a 2025 operational Central European transmission system model to investigate grid restoration strategies
【24h】

Development of a 2025 operational Central European transmission system model to investigate grid restoration strategies

机译:开发2025年可操作的中欧输电系统模型以研究电网恢复策略

获取原文
获取原文并翻译 | 示例

摘要

Massive installation of volatile renewable energy sources, decommissioning of conventional power plants as well as large-scale electricity trading create large and unprecedented power transits. Thus, grid operation will become more challenging and the risk of emergency situations or blackouts increases. This paper describes the development of a 2025 operational Central European transmission system model to investigate new grid restoration strategies with high shares of renewable generation.
机译:大规模安装易挥发的可再生能源,常规发电厂的退役以及大规模的电力贸易创造了前所未有的大规模电力运输。因此,电网运营将变得更具挑战性,紧急情况或停电的风险也会增加。本文介绍了2025年可运行的中欧输电系统模型的开发,以研究具有高份额可再生能源的新电网恢复策略。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号