【24h】

Forms of contract and methods of measurement

机译:合同形式和计量方法

获取原文
获取原文并翻译 | 示例

摘要

In this paper I will review how the nature of dredging and reclamation works has been addressed in the various forms of contract published by FIDIC and how, from a quantum point of view, the method of payment and measurement impact on the risk profile.rnThe Red Book 3rd and 4th editions of the Conditions of Contract for Civil Engineering Works published by FIDIC, recognise that dredging and reclamation works require special consideration. However FIDIC have not given any consideration to dredging and reclamation work in the 1999 suite of FIDIC contracts, which comprise of:rn1. Red Book - Conditions of Contract for Construction for Building and Engineering Works Designed by the Employer,rn2. Yellow Book - Conditions of Contract for Plant and Design-Build,rn3. Silver Book - Conditions of Contract for EPC/Turnkey Projects,rn4. Green Book - Short Form of Contract.
机译:在本文中,我将回顾FIDIC发布的各种形式的合同如何解决疏dr和填海工程的性质,以及从量子角度来看付款和计量方法如何对风险状况产生影响。 FIDIC出版的《土木工程合同条件》第3和第4版承认,疏dr和填海工程需要特别考虑。但是,FIDIC在1999年的FIDIC合同中并未考虑挖泥和填海工作,该合同包括:rn1。红皮书-用人单位设计的建筑工程施工合同条件,rn2。黄皮书-工厂和设计建造合同的条件,rn3。银书-EPC /总承包项目的合同条件,rn4。绿皮书-合同的简称。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号