【24h】

Two New Bridges over Highway near Riga

机译:里加附近的公路上的两座新桥

获取原文
获取原文并翻译 | 示例

摘要

Two new structures - highway and pedestrian bridges are located on a national highway on the north entrance of the Riga city. The highway bridge over road A2 is designed as board-stayed system and have span structure completely made from lightweight aggregate concrete (LWAC). Use of LWAC for new medium span board-stayed concrete bridge, allowed considerably decreases the slab height and ensures the target span length. For pedestrian bridge has been developed composite system using with LWA concrete filled steel pipes as the main girders and the normal weight concrete slabs for walkways. Both structures will be finished in summer 2004. The paper describes the design and construction of both bridges.
机译:两条新结构-高速公路和人行天桥位于里加市北入口的国道上。公路A2上的公路桥梁被设计为板式斜拉系统,跨度结构完全由轻骨料混凝土(LWAC)制成。将LWAC用于新的中跨板式斜拉桥,可以大大降低楼板高度并确保目标跨度。对于人行天桥,已经开发了一种复合系统,该系统使用LWA填充的钢管作为主要梁以及人行道的普通重量混凝土板。两种结构都将于2004年夏季完成。本文介绍了这两种桥梁的设计和施工。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号