首页> 外文会议>Innovative infrastructures - toward human urbanism : Report >Research on the bearing capability of the middle tower caisson foundation of Taizhou bridge
【24h】

Research on the bearing capability of the middle tower caisson foundation of Taizhou bridge

机译:台州大桥中塔沉箱基础承载力研究

获取原文
获取原文并翻译 | 示例

摘要

An caisson was adopted for the middle tower foundation of Taizhou Bridge. The shallow foundationrncalculation formula commonly used by chinese designer is not applicable for the middle towerrnfoundation located above the 200-meter overlying deposit in the water. Model test and 3Drnnumerical simulation analysis are simultaneously conducted for Taizhou Bridge, to obtain thernfoundation soil bearing capacity of the open caisson foundation of the middle tower and ensure thernstructural safety and stability.
机译:台州桥中塔基础采用沉箱。中国设计师常用的浅层基础计算公式不适用于位于水中200米以上的上层沉积物上方的中层基础。同时对台州大桥进行了模型试验和3D数值模拟分析,获得了中塔敞式沉箱基础的基础土承载力,确保了结构安全性和稳定性。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号