Agbami Field Development Concept Selection: Evaluating Facility and Field Development Alternatives in an Environment of Significant Subsurface Uncertainty

机译:Agbami田间开发概念选择:在明显的地下不确定性环境下评估设施和田间开发方案

获取原文
获取原文并翻译 | 示例

摘要

Planning the development of the Agbami field offshore Nigeria,rnas with other deepwater projects, required that criticalrnbusiness decisions be made in the absence of extensive subsurfacerndata. Along with other fundamental project componentsrnthat have a range of possible outcomes-for example,rnfinalized commercial terms, wells and facilities costs, andrnexecution schedule duration-the project team had to effectivelyrnunderstand, communicate, and incorporate all the keyrnsubsurface uncertainties in the process of achieving certainrnfield development decisions.rnChevronTexaco uses its gated five-phase ChevronTexacornProject Development and Execution Process (CPDEP) to maturernand execute all major projects. In “CPDEP-speak,” PhasernTwo involves the generation and selection of alternatives.rnPhase Three is where a “Preferred Alternative” is refined inrnpreparation for project execution in Phase Four. Additionalrnexplanation of CPDEP follows in a separate section.rnPrior to moving the project into Phase Three, two criticalrnfield development options required resolution: 1) facility processingrnand injection capacities (oil, gas, water); and 2) a dryrntree unit (DTU) versus all-subsea development decision. Itrnwas required that these development plan options be evaluatedrnover the range of possible subsurface and cost regime outcomesrnin order to select the optimum development scheme.rnProbabilistic estimates for reserves, well count, facilityrncosts, well costs, and schedule were developed. Uncertaintiesrnsuch as a potential reserve differences between dry and wetrntree development and management of multiple contracts werernincluded in the options analysis. Other operators’ decisions forrnsimilar deepwater developments were benchmarked for bestrnpractices and lessons learned.rnVarious project variables were ranked in terms of projectrnimpact in order to determine which ones drove each decisionrnand therefore which ones needed to be most fully evaluated inrnterms of understanding the range of possible outcomes.
机译:与其他深水项目一起规划尼日利亚近海的Agbami油田的开发,要求在缺乏大量地下数据的情况下做出关键的业务决策。除其他可能具有一系列可能结果的基本项目组成部分(例如,最终的商业条款,油井和设施成本以及执行进度期限)外,项目团队还必须有效地理解,沟通和纳入所有关键的地下不确定性,以实现确定的领域ChevronTexaco使用其封闭的五阶段ChevronTexacorn项目开发和执行过程(CPDEP)来成熟并执行所有主要项目。在“ CPDEP演讲”中,第二阶段涉及替代方案的生成和选择。第三阶段是对“首选替代方案”进行细化的准备,以便在第四阶段执行项目。 CPDEP的其他说明将在单独的部分中进行说明。在将项目移至第三阶段之前,需要解决两个关键领域开发方案:1)设施处理和注入能力(油,气,水); 2)干树单位(DTU)与全海底开发决策的对比。为了选择最佳的开发方案,需要在可能的地下和成本制度成果的范围内对这些开发计划选项进行评估。开发储量,井数,设施成本,井成本和进度的概率估计。期权分析中包括不确定性,例如干枯和湿性树木开发之间的潜在储量差异以及多个合同的管理。其他运营商针对类似深水开发的决策以最佳实践和经验教训为基准。rn根据项目影响对各种项目变量进行排名,以确定哪些因素推动了每个决策,因此需要对哪些变量进行最充分的评估,以了解可能结果的范围。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号