首页> 外文会议>Innovation in civil engineering, architecture and sustainable infrastructure >Numerical Simulation of Excavation of Abutment Slope at Left Bank in Dagangshan Hydropower Station
【24h】

Numerical Simulation of Excavation of Abutment Slope at Left Bank in Dagangshan Hydropower Station

机译:大港山水电站左岸桥台边坡开挖的数值模拟。

获取原文
获取原文并翻译 | 示例

摘要

The abutment slope at left bank in Dagangshan hydropower station has complex geological conditions with deep fractures,developed faults and unloading crack.The excavation will influence the stability of the slope.To evaluate the slope stability,the finite element model of this abutment slope was built in this paper to study the deformation,stress and plastic zone distribution of the slope during the excavation.The potential failure location of the slope is forecasted,some suggestions are proposed to be helpful to keep the stability of the slope.
机译:大港山水电站左岸基台边坡地质条件复杂,裂缝深,断层发育,卸荷裂缝,开挖会影响边坡的稳定性,为评价边坡的稳定性,建立了该基台边坡的有限元模型。本文对开挖过程中边坡的变形,应力和塑性区分布进行了研究。对边坡的潜在破坏位置进行了预测,并提出了一些建议,以保持边坡的稳定性。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号