首页> 外文会议>IEEE Photovoltaic Specialists Conference;PVSC >Increasing Predictability and investor confidence in PV power plants through latent defect screening
【24h】

Increasing Predictability and investor confidence in PV power plants through latent defect screening

机译:通过潜在缺陷筛查提高光伏电站的可预测性和投资者信心

获取原文

摘要

Solar power plant investors expect photovoltaic (PV) modules to safely and efficiently produce electricity for 25 years. International certification standards such as IEC are designed to evaluate modules for defects and design flaws that contribute to product safety or early lifetime performance issues. This certification testing is performed on a small number of preproduction panels. The majority of solar panel issues observed in the field, however, are driven by deviations in the manufacturing process, not by fundamental design flaws. These off-specification manufacturing defects are typically latent. This means that the panels initially meet performance expectations, but suffer accelerated performance degradation. Accurate data on the percentage of panels that exhibit significant latent defects is hard to come-by, but several studies suggest that the industry rate is around 4%. The appearance of latent defects significantly increases operating costs for the installation. The ability to gain knowledge of the exact quality of the PV panels installed at a power plant provides opportunity for improved output predictability and investor confidence. This knowledge will be increasingly important as the market penetration of PV increases, especially considering the more than 600 module suppliers. There is currently no certification to insure against PV panel underperformance caused by latent defects. In this article we introduce the concept of latent defect screening for PV modules. Latent defect screening involves the random sampling and accelerated-life testing of the PV panels to be installed at the construction site. We find that for an additional system cost of 1 penny per watt, we can be 95% sure that there are fewer than 3% defects in a 20MW installation.
机译:太阳能发电厂的投资者希望光伏(PV)组件能够安全有效地发电25年。 IEC等国际认证标准旨在评估模块的缺陷和设计缺陷,这些缺陷和缺陷会导致产品安全或早期性能问题。此认证测试是在少量预生产面板上执行的。但是,在该领域中观察到的大多数太阳能电池板问题是由制造过程中的偏差而不是基本设计缺陷引起的。这些超规格制造缺陷通常是潜在的。这意味着面板最初满足性能期望,但是会加速性能下降。很难获得有关显示出明显潜在缺陷的面板百分比的准确数据,但是一些研究表明,该行业的比率约为4%。潜在缺陷的出现大大增加了安装的运营成本。了解电厂安装的光伏电池板确切质量的能力为提高产量可预测性和投资者信心提供了机会。随着光伏市场渗透率的提高,这一知识将变得越来越重要,尤其是考虑到600多个模块供应商。当前没有任何认证可确保潜在缺陷导致的光伏面板性能下降。在本文中,我们介绍了光伏组件潜在缺陷筛选的概念。潜在缺陷筛选涉及对将要安装在施工现场的光伏电池板的随机采样和加速寿命测试。我们发现,对于每瓦1便士的额外系统成本,我们可以95%地确定20MW安装中的缺陷少于3%。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号