首页> 外文会议>The 4th IEEE Conference on Power Engineering and Renewable Energy >Lesson Learned from Power System Design with PowerWorld Simulator
【24h】

Lesson Learned from Power System Design with PowerWorld Simulator

机译:使用PowerWorld Simulator从电源系统设计中学到的教训

获取原文
获取原文并翻译 | 示例

摘要

Complexity design of power system is probably one of the reluctances for undergraduate or graduate students to attend power engineering courses. However, using simulation tools will attract and encourage students to have their own design and model as well as its analysis. This paper presents a protocol model of 10-bus system with PowerWorld simulator includes load flow and fault analysis as design verifications. To obtain a reliable model, the basic knowledge of power system components following specific criteria must be fulfilled in the selection of initial data. In the verification stage, the proposed model has been tested with load flow method in the normal and contingency operations, then fault analysis is followed to simulate the proposed model responses in both three-phase and single-phase to ground faults. The measured parameters in these stages are focused on the bus voltage magnitude and its phase angle as one of the reference indicators for the state of power system operation.
机译:电力系统的复杂性设计可能是本科生或研究生不愿参加电力工程课程的一种方式。但是,使用仿真工具将吸引并鼓励学生拥有自己的设计和模型及其分析。本文提出了带有PowerWorld模拟器的10总线系统的协议模型,其中包括潮流和故障分析作为设计验证。为了获得可靠的模型,在选择初始数据时必须满足遵循特定标准的电力系统组件的基本知识。在验证阶段,所提出的模型已经通过潮流方法在正常和应急操作中进行了测试,然后进行故障分析以模拟所提出的模型在三相和单相中对接地故障的响应。在这些阶段中,所测量的参数集中在母线电压幅值及其相角上,作为电力系统运行状态的参考指标之一。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号