RESERVOIR SEDIMENTATION EFFECTS ON HYDROPOWER GENERATION - A CASE STUDY

机译:水库发电对水库泥沙影响的研究

获取原文
获取原文并翻译 | 示例

摘要

The analysis of the existing hydroelectric power plants in Brazil shows that, in manyrncases, the sedimentological studies didn’t reach the adequate extension or weren’t evenrnmade. This procedure can be partially explained by the fact that 80% of the 53000 MWrninstalled in hydroelectrics by 1991, including the total capacity of Itaipu, are concentratedrnin almost 20 power plants, the reservoirs volumes of which are bigger than 1000 hm~3.rnWith the perspective of building power plants with smaller reservoirs, the sedimentationrnproblems must increase. In this paper the case of the Mascarenhas power plant, in thernDoce river, ES, operating since 1974, is being analysed. The project of sedimentologicalrnstudies of the reservoir was not included. It’s shown that the problems which occurrnnowadays could have been forecasted during the project study, if data and technologyrnavailable on that occasion had been used. The results show the importance of makingrnsedimentological studies before the dam construction.
机译:对巴西现有水力发电厂的分析表明,在许多情况下,沉积学研究没有达到适当的扩展范围,甚至没有进行。到1991年安装在水力发电站中的53000 MWrn中的80%(包括伊泰普的总容量)集中在近20个发电厂中,这些发电厂的水库容量大于1000 hm〜3。从建造较小水库的发电厂的角度来看,沉积问题必须增加。在本文中,正在分析自1974年开始运营的位于ES恩多西河的Mascarenhas电厂的案例。水库的沉积学研究项目不包括在内。结果表明,如果使用了当时可用的数据和技术,那么在项目研究过程中可以预见到当今出现的问题。结果表明在大坝建设之前进行沉积学研究的重要性。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号