【24h】

INITIATION OF MOTION AND DIMENSIONLESS CRITICAL SHEAR STRESS IN A STEEP MOUNTAIN STREAM

机译:陡山流中运动和超临界剪切应力的初始化

获取原文
获取原文并翻译 | 示例

摘要

Field measurements of travel length were performed in a small experimentalrncatchment of the Dolomites (Rio Cordon 5 km~2). A set of 420 sorted marked pebblesrn(0.032 < D < 0.512 m) was displaced across the stream and their movements werernchecked periodically.rnAfter introducing a criterion to define incipient motion condition based on the ratiornbetween pebble travel length and diameter, it is possible to establish the initiation ofrnmovements. The results are compared with the equimobility relationship gave byrnShields (1936) and modified by Parker (1995) and with selective entrainmentrnrelationship from other authors.
机译:在一个小的白云岩实验集水区(里约·哥顿5 km〜2)进行野外旅行长度的野外测量。一组420个分类标记的鹅卵石(0.032

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号